Temporary Works Design & 3D Scaffolding Modelling
Every Arcadia Scaffolding project begins with a full 3D temporary works design. Before a single component reaches site, the scaffold has been engineered, modelled, and reviewed — giving clients, contractors, and H&S teams complete confidence in what is coming.
Designed Before It's Built — Every Time
Temporary works design is not optional for us — it is fundamental to how we work. Every Arcadia Scaffolding project, regardless of size, starts with a proper design process. The scaffold is modelled in 3D, engineered for the specific loads and geometry, and reviewed before erection begins.
This approach delivers multiple benefits. Clients and principal contractors can see exactly what will be built. H&S teams can review the design and raise questions before work starts rather than on the day. Programme risk is reduced because design problems are resolved on screen, not on site. The Layher system is particularly well-suited to 3D design. Its modular geometry is precise and predictable — every component has known dimensions and load capacities. This means the 3D model is accurate and the engineered design matches what is actually erected on site.
There are no improvised adaptations or unexpected site conditions. The design is reviewed by all stakeholders before erection begins, ensuring the access solution integrates with facility operations and does not compromise containment or compliance.
Temporary Works Design Services
3D Scaffolding Modelling
Full three-dimensional modelling of every scaffold structure, showing exactly what will be built before work begins.
Structural Engineering
Temporary works engineering covering loads, imposed forces, tie patterns, and structural capacity for all scaffold configurations.
Design Documentation
Comprehensive design drawings, load calculations, and supporting documentation for client and principal contractor approval.
Method Statements & Risk Assessments
Detailed method statements and risk assessments covering erection, use, alteration, and dismantling of every structure.
Pre-Construction Review
Design review meetings with clients, principal contractors, and H&S teams before erection begins.
Design for Complex Geometries
3D design is particularly valuable for complex or irregular structures where conventional design methods are insufficient.
Common Questions
Do all Arcadia Scaffolding projects include 3D design?
Yes. Full 3D temporary works design is standard on every project, not an optional extra. We believe that designing the scaffold properly before it is built is fundamental to safe, efficient scaffolding — and our clients agree.
What is included in your temporary works design package?
Our standard package includes 3D modelling of the scaffold structure, structural engineering calculations, design drawings, load information for tie design, method statements, and risk assessments. Documentation is provided for client and principal contractor approval before erection begins.
Can you design scaffolding for complex or unusual structures?
Yes. 3D design is particularly valuable for complex geometries, process plant environments, and structures where conventional scaffolding approaches do not work. The Layher system's modular precision makes it well-suited to complex design challenges.